Commercial paving in the basin is a logistics problem as much as a mix problem. Deliveries, fire lanes, ADA, and night temperatures all have to be on the schedule before the first truck of mix leaves the plant.
We write a phasing plan with you, not after the first complaint from a tenant. Medical and church lots get Sunday/Monday windows. Retail gets night work in the heat. Shop yards get the truck-path panels built heavier than the employee parking.
If you own lots in both Odessa and Midland, we will spec them as a pair so you are not maintaining two different standards.
